Construction Management Department
EKONERG Ltd.

PHOTO 1  |  PHOTO 2 PHOTO 3  |  PHOTO 4  |  PHOTO 5  |  VIDEO
 

VIDEO 

 

1. Have a look of videos from surveillance inspections of preinsulated main district heating pipelines and preinsulated main steam pipelines in the final stages of construction:

1.a.  After the water pressure test, before PUR filling and assembling of shrinkable couplers on the preinsulated district heating pipeline
 
1.b.  Detection of rupture and repair of wire control system on preinsulated hot water pipelines
 
1.c.  Completion of thermal prestressing of preinsulated main district heating pipelines and preparation for final sand filling and trench backfilling
 
1.d.  A view at the part of preinsulated district heating pipeline installed in the output pit after tunneling under roads and indentation of district heating pipelines through protective pipes
 
1.d.  Start of sand filling of the trench
 
 

2. Have a look of videos from surveillance inspections of the main gas pipelines routes:

2.a.  Overhead welding of the gas pipeline route
 
2.b.  Welding of the gas pipeline route by using protective remedies – welding under a tent
 
2.c.  Anticorrosive testing of isolation of the gas pipeline connection
 
2.d.  Tunneling and indendation of the protective tubes

 